What to Expect: Our New Home Building Process

Buying a home ranks up there with some of the most exciting milestones in one’s life. Like graduating from college or getting married, these incredible moments typically require planning, patience and a process. The good news for you is that we’ve been building new homes for a long time and have a process that will make your dream home experience enjoyable. Here’s what you can expect when building a new home with MasterCraft.

EXPLORE

  • Discovery Process – Meet with your Community New Home Consultant. They will help you to select the floor plan that best suits your needs. From there, they will help you to customize the home by reviewing flex options, plumbing and electrical options, and any customization that you request.
  • Mortgage Application – Apply for mortgage pre-approval within 5 days of your contract execution.

DESIGN

  • Plan Review Meeting –  Your plans will be drawn according to the customization and options you chose during contract execution. You and your New Home Consultant will review your plans to confirm that all changes have been made. This can be done in person or by phone/email.
  • Design Center Appointment – You will meet with your design center team to make your interior color selections as well as with our Audio/Visual team to discuss your structured wiring options. Depending upon your needs, we can also schedule you to meet for appliance upgrade options and pool options.

DECIDE

  • Contract Execution- Structural options must be selected by time of contract execution.
  • Pre-Construction Meeting – After all structural, interior and exterior selections have been made and the permit has been received, you will attend the Pre-Construction meeting. We will do a final review of all of your plans and options, as well as setting time lines and expectations of what is to come next in the building process.
  • Ready, Set, Wait! –  At this stage in the process, you might not see much activity on your homesite. That’s normal. There’s a lot of behind-the-scenes work happening. This is when we secure the various permits, finalize plans, distribute blueprints to the plumbers, electricians and framers and order materials. It might be several weeks before any major activity begins on your homesite, but rest assured that all of the background work is being done to create a smooth process!

BUILD

  • Form Boards and Underground Plumbing – First, form boards will be put up and the underground plumbing will be completed.
  • Foundation – Once the rough plumbing is in place, we will get the necessary inspection and pour your concrete foundation.
  • Truss and lumber – The truss and lumber package will be dropped on site and the framers will start installing almost immediately.
  • Framing – Our framers are the best around! They will begin to frame your home per your specifications. We use 2”x6” exterior framing and the “zip system” to eliminate moisture intrusion.
  • Electrical and security – Our electricians will lay out all prewires (security, outlets, ceiling fans, etc.).
  • Pre-Drywall Orientation – This meeting is done just prior to the drywall being hung. We will walk through the home and again ensure that everything is where it is supposed to be per your plans. This gives you the chance to see our superior construction first hand and ask your superintendent any questions you may have.
  • Drywall and Trim – Drywall will be hung and completed. Trim work including baseboards and door molding will be completed at this time.
  • Tile – Wall and floor tile will now be installed. We discourage you from touring the home during tile installation due to safety hazards.
  • Cabinets/flooring/countertops – The cabinetry, flooring and countertops will be installed per the style/specifications you chose during your design center meeting.
  • Landscaping – The yard will be fully irrigated, landscaped and sodded with St. Augustine grass. We will run the sprinkler system as often as possible until closing to make sure the sod takes root and survives.

CLOSE

  • Punch List – At this stage your home is almost complete. We will be addressing the remaining finish items to ensure that your home is move in ready.
  • Homeowner Orientation – One week prior to closing we will meet at your new home and walk through with our superintendent. This meeting is intended to “introduce” you to your new home, such as how to locate water shut offs, how to operate systems, etc. Any remaining imperfections will be addressed and noted as well (paint touch ups, drywall bumps, etc.).
  • Final Walk Through – Our final walk through and meeting will be one hour before the closing is scheduled to take place. This meeting is intended to verify that all items notated at the orientation have been addressed and that home is ready for closing.
  • Closing – At closing you will be accompanied by one of our managing. You will sign the final paperwork and receive the keys to your dream home!!

Our commitment to you doesn’t just stop there….

  • 30-day Warranty Walkthrough – Our warranty team will contact you to set up a walkthrough 30 days after closing. If you have found any items that need attention since closing, make a list and we will address them at this time.
  • 11-month Warranty Walkthrough – Our warranty team will contact you again 11 months after closing to verify that your home has met the higher standards that we promised.